The time off was fabulous, if perhaps too short. I have yet to find someone who will pay me for working on the projects I want to work on, but I suppose it's the same problem we all have.
The goals for the holiday were several.
1) Finish repairing, scraping, priming and painting the soffit.
2) Kill some of the weeds in the lawn with weed killer.
3) Scrape, prime and paint the integrated gutter on the back porch.
4) Take a day trip or two to see some fun things in the area.
As expected, not everything was accomplished. The only item on the list that was completed was number 2. We lost one entire day to Ms. Huis having the flu and one entire day to rain.
The soffit is mostly done with just the final coat of paint to put on two sides. I did not rent a lift or a scaffold and there's no doubt it would have gone faster, but the hassle of setting up and moving a scaffold, as well as the added cost just didn't seem worth it. Besides who needs a scaffold, when I can build this?
I didn't walk on this, only used it to hold my paint tray so I wouldn't have to go all the way down to the ground to dip the roller or the brush. The other sides of the house weren't bad as I was able to reach the soffit by standing on the first floor roofs. Once the soffits are painted, it'll be time to start working on winterizing the house.
Its hard to imagine, but old man winter will be here before I know it.
Wednesday, August 26, 2009
Subscribe to:
Post Comments (Atom)
1 comment:
That's both ingenious and scary at the same time. I am hiding this from my fiance', lest he get any ideas.
Good thinking!
Post a Comment