Friday, July 23, 2010
Plastered
The plastering is done. They did a great job on the dining room ceiling and a pretty good job on the guest room. Its a huge improvement over what was there. I don't look up and cringe every time I sit down to eat.
I was fairly certain we had overpaid the plasterers when they started the job, but once the ceiling of the guest room needed to be torn down and redone, I felt better. We got enough hours of work out of them to make the quote about right. In total, it cost us about $4 a square foot. That's a lot more than if I had done it, but I know what my plastering looks like. Oak bark looks smoother.
I also finally finished the screens I started eons ago. That project took entirely too long considering what was involved. Its good to have one more thing checked off.
We've had a lot of rain this July. Average rain fall in July is 3.31 inches. We've had 9.45 inches to date and they are forecasting more rain tonight and tomorrow. There's still one week left to July. The good news is that the basement is mostly dry. Some moisture is coming up through cracks in the slab, and hydrostatic pressure is causing dampness around the corners. The only way to fix that is to put in an interior drain field, and that's many years down the priority list.
I'm still waiting on a quote from our carpenter for the front entry. I think a little pressure is needed there. We also got back a quote for refinishing the front door. It looked really good, but now I have to figure out what to put in place of the front door while they are repairing the original. I don't think I'm keen on having no front door for a week or so.
Of course it might be an opportunity for some interesting stories for the blog.
Subscribe to:
Post Comments (Atom)
1 comment:
Contact local door suppliers. You may be able to locate a "construction door" for temporary use. We've got a 36 in. construction door I wish we could lend you. But distance …
Post a Comment