Scott was supposed to be on site yesterday at about 2:00 pm to do some initial wiring. Scot was a no show, with no call to tell me he'd be a no show. I can only assume, based on my experiences and on performance of 80%+ of the contractors that I've engaged with that this is normal. And it drives me crazy.
Scott called me early today to say that with all the rain we've been having, he wouldn't be able to plow in the electrical cable from the house to the garage, and would it be fine to wait a week for the ground to dry out. Naturally I agreed, as I'm not really on a tight schedule with this project.